ARC GUIDELINES

HOME | NOTICES-REMINDERS | CALENDAR OF EVENTS | UPCOMING EVENTS AT THE PLANTATION | PLANTATION TIMES | TRADING POST | LOST & FOUND | NEIGHBORS HELPING NEIGHBORS | CLUBS-GROUPS | NEIGHBORHOOD NEWS | SMILES | IN THE NEWS | RESOURCES/BOOKLETS | DIRECTIONS/MAPS | TELEPHONE NUMBERS | HOA BOARD OF DIRECTORS | HOA ADMINISTRATION | ACTIVITIES DEPARTMENT | PHOTOS ARCHIVE | PRO BOARD | GUARD-GATE | F.A.Q.'S | ARC GUIDELINES | EMERGENCY PREPAREDNESS - SAVE A LIFE | WATER | LINKS & NEWS | PLANTATION GOLF CLUB | RESTAURANT | AREA EVENTS-INFORMATION

DID YOU KNOW???

AS A DEED RESTRICTED COMMUNITY, ALL MODIFICATIONS TO THE EXTERIOR OF YOUR HOME OR YOUR PROPERTY MUST BE APPROVED IN ADVANCE BY THE ARCHITECTURAL REVIEW COMMITTEE (ARC)

ARC GUIDELINES BOOKLET

CLICK HERE---->ARC REQUEST FORM rev.3-07

Conditions for Approval of Architectural Application

1. All improvements (changes, additions or alterations of home/lot) shall be made in compliance with The Plantation at Leesburg Homeowners Association Declaration of Covenants Conditions, Easement and Restrictions; the Bylaws, Rules and Regulations and any Governmental Agencies with jurisdiction.

2. A copy of the lot survey specifying lot lines and placement of additions must be attached to the application. It is the homeowners` responsibility to obtain the necessary survey. It is the Homeowners` responsibility to conform to all easements, set backs and common areas.

3. All materials must be the same as the existing structure and colors should be coordinated and have color samples attached to the application.  Earth tones are acceptable.

4. After the ARC approval it is up to the homeowner to obtain any required building permits form Lake County.

5. Homeowner is required to call to have locates for all underground pipe and wire prior to renovation.

6. Homeowner is responsible for any damage to the Common Areas and other residential areas.

7. Approval is only for the design submitted and must be completed with a 6 month time frame.

8. The Architectural Review Committee meets every other Wednesday and Applications must be submitted by 12:00 PM on the preceding Friday.

THE PLANTATION AT LEESBURG HOMEOWNERS ASSOCIATION

ARCHITECTURAL REVIEW COMMITTEE

2008 SCHEDULE OF MEETINGS

06/11/08

06/25/08

07/09/08

08/06/08

08/20/08

09/17/08

10/01/08

10/15/08

10/29/08

11/12/08

11/26/08

12/10/08

12/24/08

ARC request applications can be picked up at the Administration Office.

Turn back in by 12 pm Friday prior to the meeting date.

FYI Re: Letters concerning routine inspections of Lawn, Landscaping, Siding and Roofs....
 
Routine inspections of ALL villages (which are done annually) were completed within the past 2 months and letters were sent out in June.  If you were the recipient of a letter, please be advised that in most cases it was to advise you......
 
Regarding lawns: your irrigation system might need checked to make sure it includes dry areas; or that you need to re-sod some areas.
 
Regarding siding:  In Florida, siding can show signs of mildew, become unsightly, and should be washed.
 
Regarding landscaping:  Some homes have landscaping which has become overgrown, or full of weeds and is in need of maintenance.
 
Regarding roofs:  In Florida, roofs can show signs of mildew (especially if under tree canopy) and will need washed to keep their fresh appearance.
 
Notify the Administration Office 326-1250 if you have taken care of these issues since the inspection was completed.
*******************************************************************************

Have Questions about ARC?
Submit the form below with your question.

Full name:
Email address:
Your ARC Question
  

decoratinguidelines2007.jpg

.

Karen Sloan - Webmaster
karenpc.jpg
copyright 2007
palnews@aol.com<---send email